Blueline Home
Case Studies
Building Code News
Zoning Corner
Did You Know?
Discount Pricing
B U I L D I N G    C O D E
  Z O N I N G      T E X T

Previous Issues:

Final Inspection Report Deadline Reminder

NYC Penalty Relief Program

New Online Permit Application Process

Stop Work Order Program

Borough Commissioners Rotated to New Boroughs

E-Filing update-1

E-Filing

The New NYC Building Code

Stop Work Order Patrol

New York City 'Sign off'

Chelsea Court for Palladia

The Hallmark Building

E-Trade Store Wins Award

Cardozo School of Law Library

The Chesapeake

Palm Beach in Brooklyn?

Bryant Park Hotel

July 2010


This month, P.Wolfe presents:

  • New York City Energy Conservation Code.
  • New Low Pressure Boiler Requirements.
  • Earthwork Notification Required.



  •  

    New York City Energy Conservation Code

    To meet the City's goal of reducing greenhouse emissions by 30% by 2030, the New York City Energy Conservation Code (NYCECC) sets energy-efficiency standards for new construction and alterations to existing buildings.

    The NYCECC is more stringent than the Energy Conservation Construction Code of New York State and applies to all new building and alteration applications filed on or after July 1, 2010.

    Find out more>>



    New Low Pressure Boiler Requirements

    There are several new requirements that must be followed when filing annual low pressure boiler reports.

  • A complete Boiler Inspection Report must be filed within 45 days of performing the inspection for each boiler at a property.
  • If defects are found during the inspection, the defects must be corrected and an Affirmation of Correction (BO-13 form) must be filed within 45 days of the inspection. Reports are not considered complete until the BO-13 is received.
  • Find out more>>



    Earthwork Notification Required

    All contractors with permits to conduct earthwork (excavation) must notify the Buildings Department before work may begin.


    Find out more>>
     
    P.Wolfe Services:




    Digital Archiving of DOB Records

    P.Wolfe provides digital archiving of all of your approved plans, applications, and research materials on CD in PDF format!


    < contact P.Wolfe >

    < send to a friend >


     Contact Us | Site Map | Privacy Policy | Term & Conditions | NewsletterCopyright © 2009 P.Wolfe Consulting, Inc.
    291 Broadway Suite 200 • New York, NY 10007 • (212) 938-8000